Pecos County, Texas has 57 active power projects totalling 21,374 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 8,875 MW (42%). The largest single project is Big Canyon Wind (1,500 MW wind). 21 projects have signed an interconnection agreement or reached a later stage. 5 projects in the county are listed as withdrawn or cancelled.

Active projects
57
21.4 GW capacity
IA signed or later
21
37% of active projects
Withdrawn or cancelled
5
listed by ERCOT
Changes tracked
7
since Sep 2026

Changes in Pecos County

New
10/01/2026
Whitethorn Solar Project · Solar · Pecos County
Entered the queue at 345KV 860 GIRVINSW. Projected COD 04/26/2029.
+163 MW
Withdrawn
Unconfirmed
10/01/2026
Hovey Solar 2 · Solar · Pecos County
Missing from the latest report, not yet marked withdrawn by ERCOT.
−8.1 MW
COD change
10/01/2026
Larrea Solar · Solar · Pecos County
Projected COD moved 09/18/2027 → 09/18/2029. Delay #1 for this project.
+24 mo
COD change
10/01/2026
Longfellow BESS II · BESS · Pecos County
Projected COD moved 11/30/2026 → 03/30/2028. Delay #1 for this project.
+16 mo
COD change
10/01/2026
Longfellow BESS I · BESS · Pecos County
Projected COD moved 11/30/2026 → 03/30/2028. Delay #1 for this project.
+16 mo
Stage change
09/22/2026
Elk Ridge Solar · Solar · Pecos County
Moved from FIS Requested to IA Signed.
IA Signed
Stage change
09/15/2026
MRR Solar · Solar · Pecos County
Moved from FIS Requested to IA Signed.
IA Signed

All projects

ProjectFuelMWSubstationStageCOD
Big Canyon WindWind1,50038441 Bottlebrush 345kVIA Signed07/01/2030
The Giant Arc-IIGas1,300Bus #60404 SOLSTICE CKT 02FIS Requested04/11/2030
The Giant Arc IGas1,300Bus #60404 SOLSTICE CKT 01FIS Requested04/08/2030
Gravitas I Natural GasGas1,247Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit lineFIS Requested06/30/2030
Permian I Natural GasGas1,247Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuitFIS Requested06/30/2030
Permian I SolarSolar1,126Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuitFIS Requested06/30/2030
Gravitas I SolarSolar1,125Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit lineFIS Requested06/30/2030
Gravitas I WindWind636Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit lineFIS Requested06/30/2030
Permian I WindWind636Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuitFIS Requested06/30/2030
Rio Vista SolarSolar554Tap 138kV #60393 PigCreek4A – #60385 Solstice4AFIS Requested09/02/2030
Rock House Draw GasGas52338431 TNCENTRY1_1 138 KVFIS Requested11/29/2027
Pecos Flats Wind IIWind508Tap 345kV 38441 Bottlebrush to 38435 White Baker 345kV line (TNMP)FIS Requested06/29/2030
Pecos Flats Wind IWind507Tap Bottlebrush (38441) to White Baker (38435) 345kV Line (TNMP)FIS Requested06/29/2030
Elk Ridge SolarSolar503AEP Solstice Substation #60404IA Signed07/01/2030
Titus Sienta SolarSolar502Tap 138kV 1239 Coyanosa - 11238 Blair Lake SubFIS Approved04/19/2029
MRR SolarSolar500Solstice Substation #60384 -AEPIA Signed07/01/2030
Star Of Texas SolarSolar41560152 Fort Stockton Switch 345kVFIS Requested07/01/2029
Springfield SolarSolar400Tap Leon Creek (#38355) to Woodhouse Station (#38308) 138kV lineIA Signed08/30/2028
Skyrider WindWind370138kV #38365 TNPINIONIA Signed07/01/2028
Mensa BESSBESS30960718 Pecos Valley 138kVFIS Requested06/01/2028
Laurel Wind Energy CenterWind307Tap Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 2 andIA Signed12/31/2027
Glass Mountain BB Solar 1Solar303Tap 345kV 60404 Solstice to 38441 BottlebrushFIS Requested03/01/2029
Glass Mountain BB Solar 2Solar303Tap 345kV 60404 Solstice to 38441 BottlebrushFIS Requested03/01/2029
Glass Mountain BB Solar 5Solar303Tap 345kV 60404 Solstice to 38441 BottlebrushFIS Requested10/01/2029
Glass Mountain BB Solar 3Solar303Tap 345kV 60404 Solstice to 38441 BottlebrushFIS Requested10/01/2029
Glass Mountain BB Solar 4Solar303Tap 345kV 60404 Solstice to 38441 BottlebrushFIS Requested10/01/2029
Pecos Flats SolarSolar30260404 SOLSTICE 345 kVFIS Requested10/20/2029
Pecos Flats Solar IISolar302Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5FIS Requested02/05/2029
Pecos Flats Solar IIISolar302Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5FIS Requested02/05/2029
Wisdom Solar SLFSolar299Tap 138 kV #38455 HOLIDAY SUB TNP - #38450 SOAPTREE TNPIA Signed10/06/2027
Grand Mesa BESSBESS25376582 MESA VIEW SWITCH 138kVFIS Requested09/28/2027
Selenite Springs SolarSolar253Tap 138kV 38355 Leon Creek Switching Station - 38308 Woodhouse Switching StationIA Signed08/30/2028
Larrea SolarSolar232Tap 345kV 76002 Bakerfield - 60404 Solstice CKT#1FIS Requested09/18/2029
Longfellow Solar IISolar20738432 TNCENTRY2_1 138 KVIA Signed12/31/2028
st gall IIIA StorageBESS20138355 LEON_CRK 138kVFIS Requested06/01/2028
st gall IIIB StorageBESS20138355 LEON_CRK 138kVFIS Requested06/01/2028
Pecos WindWind194Tap 345 kV 60404 Solstice (SOLSTICE7A) – 76002 Bakersfield (L_BAKERS5_1Y)IA Signed05/30/2028
Longfellow Solar ISolar17838431 TNCENTRY1_1 138 KVIA Signed12/31/2028
Whitethorn Solar ProjectSolar163345KV 860 GIRVINSWScreening04/26/2029
Valentine Energy CenterGas16260400 Lynx 138kVFIS Requested02/28/2031
Ashtrom Marigold BESS SLFBESS154860 GIRVINSW 345kVFIS Requested04/26/2029
Pentarise BESSBESS151138 kV Pig Creek (#60393)FIS Requested06/30/2030
BRP Octans BESSBESS1306671 Tombstone 138kVFIS Requested12/01/2029
Comanche Creek generating stationGas107TNCENTRY1_1 [138 kV] ( 38431)FIS Requested12/31/2027
Longfellow BESS IIBESS10638432 TNCENTRY2_1 138 KVIA Signed03/30/2028
Gatsby Energy StorageBESS103Fort Lancaster 138 kV Substation (PSSE Bus #76579)FIS Requested12/31/2030
Rio Vista StorageBESS103Tap 138kV #60393 PigCreek4A – #60385 Solstice4AFIS Requested09/02/2030
Wisdom BESS SLFBESS103Tap 138 kV #38455 HOLIDAY SUB TNP - 138 kV #38450 SOAPTREE TNPIA Signed10/06/2027
Sherbino II BESS SLFBESS7738430 TNMP White baker Switching Station 138kVIA Signed04/19/2027
Longfellow BESS IBESS5538432 TNCENTRY1_1 138 KVIA Signed03/30/2028
Alamo Street BESS2BESS10Alamo Street Sub TNPIA Signed03/30/2027
Indian Mesa repowerWind976019 Indian NWP 138kVSync Approved12/31/2026
Desert Sky repowerWind7two LCRA 138kVSync Approved05/16/2023
Woodward I repowerWind060400 Lynx 138kVSync Approved12/31/2026
Woodward 2 repowerWind060400 Lynx 138kVSync Approved12/31/2026
Tierra Bonita BESS SLFBESS0860 GIRVINSW 345kVFIS Requested06/01/2029
Sherbino II Wind repowerWind-1838430 TN White Baker 138kVSync Approved08/22/2026
Mitchell Plant Road StorageBESS202Not listedWithdrawnn/a
Mitchell Plant Road SolarSolar202Not listedWithdrawnn/a
Pecos Storage CenterBESS201Not listedWithdrawnn/a
Celeste Energy StorageBESS61Not listedWithdrawnn/a
Hovey Solar 2Solar860385 Solstice 138 kVWithdrawn09/15/2026

For residents and landowners

What power projects are planned in Pecos County?
ERCOT's October 2026 report lists 57 active projects in Pecos County totalling 21,374 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.