Victoria County power projects

Victoria County, Texas has 18 active power projects totalling 5,412 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 1,756 MW (32%). The largest single project is Blue Energy Center - Phase 3 – Steam Stage 2 (1,320 MW other). 5 projects have signed an interconnection agreement or reached a later stage. 3 projects in the county are listed as withdrawn or cancelled.

Active projects
18
5.4 GW capacity
IA signed or later
5
28% of active projects
Withdrawn or cancelled
3
listed by ERCOT
Changes tracked
9
since Sep 2026

Changes in Victoria County

New
10/01/2026
Blue Energy Center - Phase 3 – Steam Stage 2 · Other · Victoria County
Entered the queue at Tap 345kV 80286 DULCE7A - 8676 STATIC7A. Projected COD 06/15/2033.
+1,320 MW
New
10/01/2026
Blue Energy Center- Phase 1a - Gas · Gas · Victoria County
Entered the queue at Tap 345kV 80286 DULCE7A - 8676 STATIC7A. Projected COD 05/02/2030.
+780 MW
COD change
10/01/2026
Crossroads Wind · Wind · Victoria County
Projected COD moved 09/30/2027 → 02/28/2028. Delay #1 for this project.
+5 mo
COD change
10/01/2026
Oak Belt Storage · BESS · Victoria County
Projected COD moved 10/15/2029 → 03/31/2030. Delay #1 for this project.
+5 mo
COD change
10/01/2026
Oak Belt Solar · Solar · Victoria County
Projected COD moved 10/15/2029 → 03/31/2030. Delay #1 for this project.
+5 mo
MW change
10/01/2026
Blue Energy Center - Phase 1b – Steam · Gas · Victoria County
Requested capacity reduced.
1,110 → 330 MW
MW change
10/01/2026
Crossroads Wind · Wind · Victoria County
Requested capacity increased.
277 → 277 MW
Stage change
09/04/2026
Blue Energy Center - Phase 3 – Steam Stage 2 · Other · Victoria County
Moved from Screening to FIS Requested.
FIS Requested
Stage change
09/04/2026
Blue Energy Center- Phase 1a - Gas · Gas · Victoria County
Moved from Screening to FIS Requested.
FIS Requested

All projects

ProjectFuelMWSubstationStageCOD
Blue Energy Center - Phase 3 – Steam Stage 2Other1,320Tap 345kV 80286 DULCE7A - 8676 STATIC7AFIS Requested06/15/2033
Blue Energy Center- Phase 1a - GasGas780Tap 345kV 80286 DULCE7A - 8676 STATIC7AFIS Requested05/02/2030
Blue Energy Center - Phase 1b – SteamGas330Tap 345kV 80286 DULCE7A - 8676 STATIC7AFIS Requested10/17/2031
HyFuels Calhoun SolarSolar302Tap 345kV 8715 RADIANT7A - 8728 COBRA7AFIS Requested10/07/2028
Crossroads WindWind27780090 Dokmai 138 KVIA Signed02/28/2028
Leopard BESSBESS2648721 Beecher 138 kVIA Signed02/28/2029
Iguala SolarSolar250AEP South Texas Project (#5915) to Static (#8676) 345kV lineIA Signed02/01/2029
Marcos Solar SLFSolar216To the 138 kV line from EDNA (#8118) to VICTORIA4A (#8172)FIS Requested08/15/2028
Oak Belt StorageBESS210Tap 138 kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBLTSW8FIS Requested03/31/2030
Calico BESSBESS205Tap 138 kV 8723 CANGREJO4A - 8721 BEECHER4AFIS Requested06/01/2028
Arpeggio BESSBESS201#80064 Chocolate Bayou 138kVFIS Requested09/30/2029
Goldhill Energy StorageBESS201Tap 138kV 8154 VISTRON4B – 8189 TUNGSTEN4AFIS Requested09/30/2028
Oak Belt SolarSolar181Tap 138 kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBLTSW8FIS Requested03/31/2030
Two Brothers ESSBESS1558911 BLKBYU4A 138kVIA Signed02/29/2028
Tejano StorageBESS152Tap 138kV 8125 Lolita - 8172 VictoriaFIS Requested07/01/2029
Brizo BESSBESS144138 kV Loop 463 Substation (#5680)IA Signed09/01/2027
Marcos BESSBESS116To the 138 kV line from EDNA (#8118) to VICTORIA4A (#8172)FIS Requested08/15/2027
Georgia-Lynn BESSBESS10980064 CHOCBAYU4A 138 kVFIS Requested02/20/2028
Bayside SolarSolar509Not listedWithdrawnn/a
Bayside BESSBESS508Not listedWithdrawnn/a
Oriana BESSBESS60Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Victoria County?
ERCOT's October 2026 report lists 18 active projects in Victoria County totalling 5,412 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.