Hill County power projects

Hill County, Texas has 22 active power projects totalling 7,763 MW in ERCOT's interconnection queue as of the October 2026 report. Natural gas is the largest share at 4,053 MW (52%). The largest single project is Bullock Gas (1,400 MW natural gas). 11 projects have signed an interconnection agreement or reached a later stage. 5 projects in the county are listed as withdrawn or cancelled.

Active projects
22
7.8 GW capacity
IA signed or later
11
50% of active projects
Withdrawn or cancelled
5
listed by ERCOT
Changes tracked
4
since Sep 2026

Changes in Hill County

Withdrawn
Unconfirmed
10/01/2026
Three W Solar · Solar · Hill County
Missing from the latest report, not yet marked withdrawn by ERCOT.
−111 MW
COD change
10/01/2026
Compadre Solar · Solar · Hill County
Projected COD moved 07/31/2026 → 10/31/2026. Delay #1 for this project.
+3 mo
COD change
10/01/2026
Compadre Solar II · Solar · Hill County
Projected COD moved 10/01/2026 → 12/31/2026. Delay #1 for this project.
+3 mo
COD change
10/01/2026
Files BESS SLF · BESS · Hill County
Projected COD moved 12/31/2027 → 11/07/2029. Delay #1 for this project.
+22 mo

All projects

ProjectFuelMWSubstationStageCOD
Bullock GasGas1,400BULLOCK 345 KV STATION (Bus# 68096)FIS Requested07/01/2032
Liberty Thermal Energy CenterGas1,400LIBERTY 345 KV STATION (Bus# 68092)FIS Requested07/01/2032
NRG Prairie Energy CenterGas1,253Tap #1907 Venus Switch – #3389 Fort Smith Switch 345 kVFIS Requested12/31/2030
Seven Angels Energy Storage IBESS51468090 Sam Switch Bus 345kVFIS Requested12/31/2028
Seven Angels Energy Storage IIBESS51468090 Sam Switch Bus 345kVFIS Requested12/31/2028
Compadre SolarSolar406tap 345kV 68090 Sam Switch - 1907 VenusSync Approved10/31/2026
Blue Skies BESSBESS30668090 SAM SW 345kVIA Signed04/01/2028
Aquilla Lake 3 WindWind297tap 345 kV 68040 Kopperl to 68091 NavarroSync Approved11/20/2026
Mercury Solar IIISolar20468092 Liberty Station 345kVIA Signed04/01/2029
OCI Cobb Creek SolarSolar203tap 345kV 1907 Venus - 68090 Sam SwIA Signed12/31/2027
OCI Cobb Creek ESSBESS202tap 345kV 1907 Venus - 68090 Sam SwIA Signed12/31/2028
Compadre Solar IISolar201Tap 345kV 68090 Sam Switch – 3389 Fort SmithSync Approved12/31/2026
High Noon SolarSolar182Tap 138kV 445 Yates - 444 CovingtonIA Signed05/09/2028
Vial BESSBESS135Chatt(234) - Pecan Street (3352) 138kVIA Signed09/15/2027
HILLBORO BESSBESS131Tap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)FIS Requested09/21/2028
Penelope SolarSolar98New sub in the 234 Chatt - 3473 Ash Creek 138kV lineFIS Requested09/24/2029
High Noon StorageBESS94Tap 138kV 445 Yates - 444 CovingtonIA Signed05/09/2028
Payne BattlecreekSolar85tap 138kV 213 Haney - 3515 HubbardIA Signed08/25/2027
Edens SolarSolar71Tap 69kV 3532 Itasca - 3523 HillsboroFIS Requested04/09/2028
Files BESS SLFBESS34Fort Smith Switch (#3389) 345 kVFIS Requested11/07/2029
HILLBORO WINDWind33Tap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)FIS Requested09/21/2028
Mercury Storage SLFBESS068092 Liberty Station 345kVFIS Requested07/01/2029
Aquilla Lake 3 Wind (Alternative POI Oncor 138KV)Wind226Not listedWithdrawnn/a
Aquilla Lake 3 Wind ( Alternative POI Oncor 345kV)Wind226Not listedWithdrawnn/a
Three W SolarSolar111tap 138kV 3522 Hillboro1_8 - 237 Blanton CKT 1Withdrawn09/04/2026
Padrino BESSBESS101Not listedWithdrawnn/a
Leitrim 1 SolarSolar98Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Hill County?
ERCOT's October 2026 report lists 22 active projects in Hill County totalling 7,763 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.