Reeves County, Texas has 24 active power projects totalling 8,350 MW in ERCOT's interconnection queue as of the October 2026 report. Natural gas is the largest share at 4,572 MW (55%). The largest single project is Wolf Bone North Energy Center (1,174 MW natural gas). 9 projects have signed an interconnection agreement or reached a later stage. 2 projects in the county are listed as withdrawn or cancelled.

Active projects
24
8.3 GW capacity
IA signed or later
9
38% of active projects
Withdrawn or cancelled
2
listed by ERCOT
Changes tracked
5
since Sep 2026

Changes in Reeves County

New
10/01/2026
Wolf Bone North Energy Center · Gas · Reeves County
Entered the queue at TNMP Cowpen 345kV Substation POIB 38044 (4 mile transmission line will connect POI at customer substation to POIB in the Cowpen substation). Projected COD 02/28/2031.
+1,174 MW
COD change
10/01/2026
Nanulak BESS · BESS · Reeves County
Projected COD moved 03/15/2027 → 06/30/2027. Delay #1 for this project.
+4 mo
COD change
10/01/2026
Kodiak AGR1 · Other · Reeves County
Projected COD moved 06/15/2027 → 06/08/2029. Delay #1 for this project.
+24 mo
MW change
10/01/2026
Trumpet Solar · Solar · Reeves County
Requested capacity increased.
455 → 533 MW
Withdrawn
09/04/2026
Wolf Bone North Energy Center (OLD) · Gas · Reeves County
Listed as cancelled by ERCOT.
−1,204 MW

All projects

ProjectFuelMWSubstationStageCOD
Wolf Bone North Energy CenterGas1,174TNMP Cowpen 345kV Substation POIB 38044 (4 mile transmission line will connect POI at customer substation to POIB in the Cowpen substation)FIS Requested02/28/2031
Kilby1 Part 6 Large Block Combined CycleGas1,056#60404 Solstice Substation 345 kVFIS Requested07/19/2029
Kilby1 Part 4 Large Block Simple CycleGas950#60404 Solstice Substation 345 kVFIS Requested04/20/2028
Trumpet SolarSolar533tap 345kV 18723 Drylake_5 – 38125 TNFaulkner3FIS Requested07/01/2029
Glass Mountain Wind 2Wind519Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5FIS Requested12/31/2028
Glass Mountain Wind 1Wind512Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5FIS Requested12/31/2028
Capshaw SolarSolar450POIB: Tapping Drylake_5 (#18723) – TNFaulkner3 (#38125) 345 kVFIS Requested07/01/2030
Exergy Energy West Texas Natural Gas Reciprocating Power IGas40038095 TNJACKRBT1 138kVScreening05/01/2027
Kilby1 Part 1 Small Block Simple CycleGas371#60404 Solstice Substation 345 kVFIS Requested11/04/2027
Kilby1 Part 2 Tier1 BESSBESS330#60404 Solstice Substation 345 kVFIS Requested01/21/2028
Cantaloupe SolarSolar30760716 Saragosa 138kVIA Signed07/01/2028
August Draw SolarSolar250Tap 138kV 60207 Verhalen – 60808 Hoefs RoadIA Signed06/27/2028
Bracero Pecan StorageBESS23860716 Saragosa 138kVIA Signed07/01/2027
Tolivar Power Plant (TEF- Due Diligence)Gas224Tap 138 KV 38045 IH20-38043 COWPENIA Signed06/11/2027
Tolivar Power Plant Phase 2Gas224Tap 138 KV 38055 Saltdraw-38043 COWPENIA Signed09/29/2027
Blue Heron BESSBESS201Tap 138kV MANSON (1094) - Riverton (11083)IA Signed10/11/2028
Nanulak BESSBESS18238113 TNCOYOTSPG1 138kVIA Signed06/30/2027
Kodiak AGR1Other13238113 TNCOYOTSPG1FIS Requested06/08/2029
Neptune Gas Generation PlantGas11411200 Longpast_T8 138kvFIS Requested03/15/2028
Aggie Solar Project SLFSolar104POI: COYOTE SPRINGS SUBSTATION - 138KVFIS Approved11/30/2027
Alpha Digital Campus Combined-cycle and Co-located LoadGas5838044 TNCOWPEN__3 345kVFIS Requested12/31/2027
COYOTE SPRINGS AGR1Other10COYOTSPRIA Signed06/23/2026
SADDLEBACK AGR1Other10SADLBACK/SADLBK_1/38058/SADLBACK_LD8IA Signed06/23/2026
AGGIE STORAGE PROJECT SLFBESS0POI: COYOTE SPRINGS SUBSTATION - 138KVFIS Approved11/30/2027
Wolf Bone North Energy Center (OLD)Gas1,204Tap 345 kV 60404 SOLTICE7A - 18669 TOYAHCRK_5 Ckt 1Withdrawn11/01/2029
Cantaloupe StorageBESS251Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Reeves County?
ERCOT's October 2026 report lists 24 active projects in Reeves County totalling 8,350 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.