26INR0034 · BESS · Reeves County

Bracero Pecan Storage

Bracero Pecan Storage is a 238 MW battery storage project in Reeves County, Texas, connecting at 60716 Saragosa 138kV. ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 07/01/2027.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
26INR0034
Capacity
238 MW
Fuel
BESS (BA)
Interconnecting entity
Bracero Pecan Storage LLC
Projected COD
07/01/2027
Entered queue
11/07/2022
ERCOT zone
WEST
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 06/27/2024
    FIS Requested → IA Signed
  • 07/10/2023
    Screening → FIS Requested
  • 11/07/2022
    Entered the queue with 238 MW, projected COD 07/01/2027