LoneStarGrid
ERCOT GIS report of 10/01/2026 2 monthly reports compared Next update after ERCOT's next monthly report
Counties / Texas

Atascosa County power projects

Atascosa County, Texas has 14 active power projects totalling 1,677 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 1,005 MW (60%). The largest single project is Bluewind BESS (246 MW battery storage). 2 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.

Active projects
14
1.7 GW capacity
IA signed or later
2
14% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
1
since Sep 2026

Changes in Atascosa County

COD change
10/01/2026
Great Hambino BESS · BESS · Atascosa County
Projected COD moved 10/01/2027 → 10/01/2028. Delay #1 for this project.
+12 mo

All projects

For residents and landowners

What power projects are planned in Atascosa County?
ERCOT's October 2026 report lists 14 active projects in Atascosa County totalling 1,677 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.