Comanche County power projects
Comanche County, Texas has 8 active power projects totalling 2,446 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 1,781 MW (73%). The largest single project is Comanche BESS (614 MW battery storage). 4 projects have signed an interconnection agreement or reached a later stage. 3 projects in the county are listed as withdrawn or cancelled.
Active projects
8
2.4 GW capacity
IA signed or later
4
50% of active projects
Withdrawn or cancelled
3
listed by ERCOT
Changes tracked
4
since Sep 2026
Changes in Comanche County
COD change
10/01/2026
Lamkin Solar · Solar · Comanche County
Projected COD moved 08/08/2027 → 11/08/2027. Delay #1 for this project.
+3 mo
Stage change
09/17/2026
FIS Approved
Withdrawn
09/04/2026
−177 MW
Withdrawn
09/04/2026
−175 MW
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Comanche BESS | BESS | 614 | #1440 Comanche Switching Station 345kV | IA Signed | 05/07/2029 |
| Dragan Solar | Solar | 411 | 1440 Comanche 345kV | FIS Requested | 09/15/2027 |
| Dragan Storage | BESS | 408 | 1440 Comanche 345kV | FIS Requested | 03/31/2030 |
| Merope BESS | BESS | 402 | 345 kV Corn Trail Switch Substation (#11441) | FIS Requested | 03/01/2028 |
| Crios BESS | BESS | 206 | Tap 138 kV 1649 HASSE_P8 - 1684 SABANA_8 | FIS Requested | 03/01/2028 |
| Darkwood Solar | Solar | 152 | Tap 345KV 1900 Comanche Peak to 1440 Comanche SS | IA Signed | 09/20/2027 |
| Darkwood BESS | BESS | 150 | Tap 345KV 1900 Comanche Peak - 1440 Comanche Switch | IA Signed | 07/01/2028 |
| Lamkin Solar | Solar | 102 | tap 69kV 258 Hamilton - 273 Gustine | IA Signed | 11/08/2027 |
| Saddle Horn Station BESS SLF | BESS | 177 | tap 138kV 1650 COMANCHE_T8 - 290SHILOHC | Withdrawn | 09/11/2028 |
| Saddle Horn Station Solar SLF | Solar | 175 | 1650 COMANCHE_T8 - 290 SHILOHC 138 kV Line | Withdrawn | 09/11/2028 |
| Paolo Sole Gustine Solar | Solar | 40 | Not listed | Withdrawn | n/a |
For residents and landowners
- What power projects are planned in Comanche County?
- ERCOT's October 2026 report lists 8 active projects in Comanche County totalling 2,446 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.