Upton County power projects

Upton County, Texas has 18 active power projects totalling 5,612 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 1,812 MW (32%). The largest single project is West Royal Natural Gas (TEF-Due Diligence) (888 MW natural gas). 5 projects have signed an interconnection agreement or reached a later stage. 4 projects in the county are listed as withdrawn or cancelled.

Active projects
18
5.6 GW capacity
IA signed or later
5
28% of active projects
Withdrawn or cancelled
4
listed by ERCOT
Changes tracked
2
since Sep 2026

Changes in Upton County

MW change
10/01/2026
Badger Solar · Solar · Upton County
Requested capacity reduced.
302 → 280 MW
MW change
10/01/2026
Badger BESS · BESS · Upton County
Requested capacity reduced.
154 → 139 MW

All projects

ProjectFuelMWSubstationStageCOD
West Royal Natural Gas (TEF-Due Diligence)Gas888Tap 345kV 76000 L_NORTMC5_1Y - 18668 ROCKDRAW_5FIS Requested06/01/2030
Shadow Ranch SolarSolar808842 King Mountain 345kVFIS Requested06/01/2030
Tres Rios Ranch SolarSolar50876008 Twelvemile 345kVIA Signed12/31/2027
WindeckerWind42010058 Catclaw Switch 138kVFIS Requested04/17/2028
McCamey's Castle BatteryBESS41076597 Robbins Switch 138 kVIA Signed03/30/2028
Vista Bluff Wind I "Alternate POI"Wind290tap 345 kV (76000) North McCamey - (59903) BearkatFIS Requested12/31/2029
Vista Bluff Wind II "Alternate POI"Wind290tap 345 kV (76000) North McCamey - (59903) BearkatFIS Requested12/31/2029
Tres Rios Ranch BESSBESS29076008 Twelvemile 345kVIA Signed12/31/2027
Badger SolarSolar280Tap 345kV 59903 Bearkat - 76000 L_NORTMC5_1YFIS Requested05/25/2029
Mesa View StorageBESS255Tap 345 kV KINGMTSW (#842) to NORTMC (#76000)IA Signed07/15/2027
Giddings WindWind24071212 Upton 138kVFIS Requested09/09/2030
Grandfalls SolarSolar176842 King Mountain Station 345kVSync Approved11/25/2026
Grandfalls Storage SLFBESS176tap 345kV 11028 Odessa - 76000 North McCameyFIS Requested07/01/2028
ELECTRODE BESSBESS15076040 Castillo 138kVFIS Requested12/31/2027
CATHODE BESSBESS15076635 King Mountain 138kVFIS Requested12/31/2027
Badger BESSBESS139Tap 345kV 59903 Bearkat - 76000 L_NORTMC5_1YFIS Requested05/25/2029
Appaloosa Run BESSBESS103New Palouse 138kV (#60278)FIS Requested08/30/2026
SP TX-12B Phase IIISolar4076040 Castillo 138kVScreening12/02/2025
Point Mountain SolarSolar514Not listedWithdrawnn/a
Point Mountain StorageBESS507Not listedWithdrawnn/a
Vista Bluff Wind 1Wind290Not listedWithdrawnn/a
Vista Bluff Wind 2Wind290Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Upton County?
ERCOT's October 2026 report lists 18 active projects in Upton County totalling 5,612 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.