Counties / Texas
Runnels County power projects
Runnels County, Texas has 8 active power projects totalling 1,803 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 1,234 MW (68%). The largest single project is Mistflower Energy Center Solar (402 MW solar). 2 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
8
1.8 GW capacity
IA signed or later
2
25% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Runnels County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Mistflower Energy Center Solar | Solar | 402 | Tap 345kV 60072 ODYSSEUS7A– 60040 BLF_CRK7A | FIS Requested | 06/01/2030 |
| Mistflower Energy Center Storage | BESS | 313 | Tap 345kV 60072 Odysseus – 60040 Bluff Creek | FIS Requested | 06/01/2030 |
| Winters Glow Solar | Solar | 302 | tap 345kV 1444 BROWN SWITCH - 11406 CENTRAL BLUFF | FIS Requested | 04/17/2029 |
| Sawtooth Solar | Solar | 201 | Tap to the 345kV Odysseus (Bus#60072) to Bluff Creek (Bus #60040) line | FIS Requested | 08/01/2030 |
| Zuma Solar | Solar | 201 | Tap 345kV 11263 Fisk Switch - 11406 Central Bluff Switch | FIS Requested | 09/09/2030 |
| Winters Glow Storage | BESS | 155 | tap 345kV 1444 BROWN SWITCH - 11406 CENTRAL BLUFF | FIS Requested | 04/17/2029 |
| Norton Solar | Solar | 128 | 60451 Garnet 138kV | Sync Approved | 11/24/2025 |
| Rutile BESS | BESS | 101 | Tap 138kV 6340 BALLINGER - 60399 WEISS | IA Signed | 03/31/2028 |
For residents and landowners
- What power projects are planned in Runnels County?
- ERCOT's October 2026 report lists 8 active projects in Runnels County totalling 1,803 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.