Counties / Texas
Throckmorton County power projects
Throckmorton County, Texas has 6 active power projects totalling 961 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 503 MW (52%). The largest single project is Monarch Creek Wind (283 MW wind). 1 project has signed an interconnection agreement or reached a later stage. 2 projects in the county are listed as withdrawn or cancelled.
Active projects
6
1.0 GW capacity
IA signed or later
1
17% of active projects
Withdrawn or cancelled
2
listed by ERCOT
Changes tracked
6
since Sep 2026
Changes in Throckmorton County
New
10/01/2026
Sideoats Solar 1 · Solar · Throckmorton County
Entered the queue at DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345 kV. Projected COD 03/31/2031.
+168 MW
New
10/01/2026
Sideoats Solar 2 · Solar · Throckmorton County
Entered the queue at DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV. Projected COD 03/31/2031.
+168 MW
New
10/01/2026
Sideoats Solar 3 · Solar · Throckmorton County
Entered the queue at DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV. Projected COD 03/31/2031.
+168 MW
Stage change
09/15/2026
FIS Requested
Stage change
09/15/2026
FIS Requested
Stage change
09/15/2026
FIS Requested
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Monarch Creek Wind | Wind | 283 | 11419 Coody Crossing Switch 345kV | IA Signed | 09/17/2027 |
| Sideoats Solar 1 | Solar | 168 | DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345 kV | FIS Requested | 03/31/2031 |
| Sideoats Solar 2 | Solar | 168 | DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV | FIS Requested | 03/31/2031 |
| Sideoats Solar 3 | Solar | 168 | DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV | FIS Requested | 03/31/2031 |
| Sleepy Hollow BESS | BESS | 123 | Tap 138 kV 792 Murray - 6169 Paint Creek | FIS Approved | 02/22/2028 |
| Ayass BESS | BESS | 51 | 6206 Bush Knob 69kV | FIS Requested | 12/30/2028 |
| Lonesome Dove BESS | BESS | 256 | Not listed | Withdrawn | n/a |
| Leaning Tree BESS | BESS | 256 | Not listed | Withdrawn | n/a |
For residents and landowners
- What power projects are planned in Throckmorton County?
- ERCOT's October 2026 report lists 6 active projects in Throckmorton County totalling 961 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.