LoneStarGrid
ERCOT GIS report of 10/01/2026 2 monthly reports compared Next update after ERCOT's next monthly report
Counties / Texas

Jones County power projects

Jones County, Texas has 14 active power projects totalling 3,772 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 2,513 MW (67%). The largest single project is Hackberry Draw Solar (653 MW solar). 8 projects have signed an interconnection agreement or reached a later stage. 4 projects in the county are listed as withdrawn or cancelled.

Active projects
14
3.8 GW capacity
IA signed or later
8
57% of active projects
Withdrawn or cancelled
4
listed by ERCOT
Changes tracked
5
since Sep 2026

Changes in Jones County

New
10/01/2026
Lone Tiger Solar · Solar · Jones County
Entered the queue at Tap 345 kV Claytonville (#68001) to phantom hill (#68004). Projected COD 10/06/2029.
+243 MW
COD change
10/01/2026
Funston Solar · Solar · Jones County
Projected COD moved 07/01/2027 → 02/26/2027. Moved earlier.
-4 mo
COD change
10/01/2026
Tiger Solar · Solar · Jones County
Projected COD moved 06/30/2027 → 02/26/2027. Moved earlier.
-4 mo
Withdrawn
09/30/2026
Skeeter Solar · Solar · Jones County
Listed as inactive by ERCOT.
−251 MW
Stage change
09/14/2026
Lone Tiger Solar · Solar · Jones County
Moved from Screening to FIS Requested.
FIS Requested

All projects

ProjectFuelMWSubstationStageCOD
Hackberry Draw SolarSolar653Tap 345 kV (68000) West Shackleford - (60515) Clear Crossing Ckt 2FIS Requested04/30/2030
Moccasin StorageBESS603Tap 345kV #60707 Kirchhoff - #60515 Clear Crossing CKT-1FIS Requested07/01/2028
Funston SolarSolar351tap 345 kV 68000 West Shackelford – 68004 Phantom Hill Circuit 2IA Signed02/26/2027
Tiger SolarSolar25168004 PHANTOM HILL 345KVIA Signed02/26/2027
Lone Tiger SolarSolar243Tap 345 kV Claytonville (#68001) to phantom hill (#68004)FIS Requested10/06/2029
Crowded Star SolarSolar219tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)Sync Approved08/17/2026
Hamby SolarSolar2066245 ABILENE ROBERTSON PRISON 138 KVIA Signed06/27/2028
Crowded Star I BESSBESS20368014 Open SkyIA Signed07/09/2027
Anson Solar 2Solar201existing tap 345 kV 68004 Phantom Hill stationSync Approved10/01/2026
Anson Solar Center, Phase IIISolar200tap 345kV 68000 WShack - 68001 ClaytonFIS Requested06/01/2028
Crowded Star Solar IISolar190tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)Sync Approved09/18/2026
Anson BATBESS154tap 345 kV 68004 Phantom Hill stationIA Signed12/01/2027
Solara BESS 1BESS15060387 Hendrick 138kVFIS Requested11/30/2027
Solara BESS 2BESS15060387 Hendrick 138kVFIS Requested11/30/2027
Funston Solar (AEP POI)Solar355Not listedWithdrawnn/a
Tiger StorageBESS251Not listedWithdrawnn/a
Skeeter SolarSolar251345 kV SWEETWATER EAST (11420) - LONG CREEK (1435)Withdrawn06/30/2029
Inertia BESS 3BESS108Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Jones County?
ERCOT's October 2026 report lists 14 active projects in Jones County totalling 3,772 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.