Coke County power projects

Coke County, Texas has 5 active power projects totalling 808 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 424 MW (52%). The largest single project is Roboman Solar (273 MW solar). 1 project has signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.

Active projects
5
0.8 GW capacity
IA signed or later
1
20% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
2
since Sep 2026

Changes in Coke County

COD change
10/01/2026
Ulysses Solar · Solar · Coke County
Projected COD moved 03/02/2027 → 03/17/2027. Delay #1 for this project.
0 mo
Stage change
09/18/2026
Ulysses Solar · Solar · Coke County
Moved from IA Signed to Energization Approved.
Energization Approved

All projects

ProjectFuelMWSubstationStageCOD
Roboman SolarSolar273Tap 345 kV (#76009) Twin Buttes – (#76090) Divide Ckt 1FIS Requested07/01/2029
Coke BESSBESS22076090 Divide Switchyard 345kVFIS Requested04/10/2028
Ulysses SolarSolar15160072 Odysseus Substation 345 kVEnergization Approved03/17/2027
Hayrick BESSBESS1146351 Nicole 138kVFIS Approved03/15/2028
Fort Chadbourne Cattle BESSBESS506324 Fort Chadbourne 138 kvFIS Requested06/29/2027

For residents and landowners

What power projects are planned in Coke County?
ERCOT's October 2026 report lists 5 active projects in Coke County totalling 808 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.