Substation / point of interconnection ยท Deaf Smith County

23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).

2 active projects totalling 891 MW are queued to connect at 23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD). in Deaf Smith County, Texas, according to ERCOT's October 2026 report.

Active capacity
891 MW
queued at this substation
Active projects
2
2 projects ever listed
Withdrawn share EST
0%
of projects listed here
Voltage
345 kV
read from the name

Projects at this substation

INRProjectFuelMWStageCODDelays
29INR0009Aurelius 2 SolarSolar445IA Signed09/30/20280
29INR0011Aurelius 3 SolarSolar445FIS Requested06/30/20301