LoneStarGrid
ERCOT GIS report of 10/01/2026 2 monthly reports compared Next update after ERCOT's next monthly report
29INR0009 · Solar · Deaf Smith County

Aurelius 2 Solar

Aurelius 2 Solar is a 445 MW solar project in Deaf Smith County, Texas, connecting at 23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).. ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 09/30/2028.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
29INR0009
Capacity
445 MW
Fuel
Solar (PV)
Interconnecting entity
IP Roman, LLC
Projected COD
09/30/2028
Entered queue
11/30/2023
ERCOT zone
PANHANDLE
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 07/10/2026
    FIS Requested → IA Signed
  • 11/30/2023
    Entered the queue with 445 MW, projected COD 09/30/2028
  • 11/30/2023
    Screening → FIS Requested

Other projects at this substation

Aurelius 3 SolarSolar445 MWFIS Requested