29INR0011 · Solar · Deaf Smith County

Aurelius 3 Solar

COD delayed 1×

Aurelius 3 Solar is a 445 MW solar project in Deaf Smith County, Texas, connecting at 23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).. ERCOT's October 2026 report shows it at the FIS Requested stage with a projected commercial operation date of 06/30/2030. Its projected COD has been pushed back 1 time in the reports compared.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
29INR0011
Capacity
445 MW
Fuel
Solar (PV)
Interconnecting entity
IP Roman III, LLC
Projected COD
06/30/2030
Entered queue
11/30/2023
ERCOT zone
PANHANDLE
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 10/01/2026
    Projected COD moved 03/31/2029 → 06/30/2030 (+15 months)
  • 11/30/2023
    Entered the queue with 445 MW, projected COD 03/31/2029
  • 11/30/2023
    Screening → FIS Requested

Other projects at this substation

Aurelius 2 SolarSolar445 MWIA Signed