LoneStarGrid
ERCOT GIS report of 10/01/2026 2 monthly reports compared Next update after ERCOT's next monthly report
Counties / Texas

Wilson County power projects

Wilson County, Texas has 15 active power projects totalling 3,533 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 1,631 MW (46%). The largest single project is Clear Fork Creek Solar (602 MW solar). 6 projects have signed an interconnection agreement or reached a later stage. 3 projects in the county are listed as withdrawn or cancelled.

Active projects
15
3.5 GW capacity
IA signed or later
6
40% of active projects
Withdrawn or cancelled
3
listed by ERCOT
Changes tracked
0
since Sep 2026

Changes in Wilson County

No changes in the reports compared so far.

All projects

ProjectFuelMWSubstationStageCOD
Clear Fork Creek SolarSolar602Tap 345KV 5133 Elm Creek - 5323 Old HickoryIA Signed04/29/2027
Mojo SolarSolar528Tap 345 kV 5133 Elm Creek - 5901 San Miguel CKT 1 & 2FIS Requested06/30/2028
Wilson Gas PlantGas403Tap 345 kV 5133 ELMCREEK - 5901 MIGUEL5 CKT 1FIS Requested06/30/2028
Nockenut Springs Storage 1BESS209Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPSFIS Requested06/05/2029
Nockenut Springs Storage 2BESS209Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPSFIS Requested06/05/2029
Nockenut Springs Storage 3BESS209Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPSFIS Requested06/05/2029
Anila BESSBESS209Tap of 345 kV Elm Creek (Bus# 5133) - San Miguel Gen (Bus# 5901) Transmission Line Ckt 1IA Signed09/30/2028
Marcelina StorageBESS203Tap 345 kV 5133 Elm Creek - 5901 San MiguelFIS Approved12/18/2026
Anila SolarSolar201Tap 345kV 5133 Elm Creek - 5901 San Miguel Gen Ckt 1IA Signed09/30/2028
Moon Stone BESSBESS201Tap 138kV Eagle Creek (5132) to Floresville (5155)Screening03/31/2029
Moonstone Solar ProjectSolar175Tap 138kV Eagle Creek (5132) to Floresville (5155)IA Signed03/31/2029
Strawberry Acres StorageBESS1575132 Eagle Creek Substation 138kVFIS Approved09/30/2028
Huisache SolarSolar126Tapping the Elm Creek to Shaula circuit 1IA Signed06/30/2029
Huisache BESSBESS101Tapping the Elm Creek to Shaula circuit 1IA Signed06/30/2029
Cachena Storage SLFBESS0Tap 345KV 5133 Elmcreek - 5323 Old HickoryFIS Requested04/29/2027
Pandora SolarSolar252Not listedWithdrawnn/a
Stockdale BESSBESS204Not listedWithdrawnn/a
Stockdale SolarSolar152Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Wilson County?
ERCOT's October 2026 report lists 15 active projects in Wilson County totalling 3,533 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.