Medina County power projects
Medina County, Texas has 7 active power projects totalling 956 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 745 MW (78%). The largest single project is Devine Mary BESS (201 MW battery storage). 0 projects have signed an interconnection agreement or reached a later stage. 1 project in the county is listed as withdrawn or cancelled.
Active projects
7
1.0 GW capacity
IA signed or later
0
0% of active projects
Withdrawn or cancelled
1
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Medina County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Devine Mary BESS | BESS | 201 | 5813 PEARSONSW8 138 kV | FIS Requested | 11/21/2028 |
| Chacon Creek | BESS | 189 | (#8962) LYTLE4A 138KV | FIS Requested | 10/31/2027 |
| Ranger BESS | BESS | 155 | SSWG Bus name: CSTROVILESB8 , Bus# : 5804 | FIS Requested | 04/29/2029 |
| Dunlay Solar | Solar | 150 | Tap 138kV 5813 PearsonSW - 5225 Hondo | FIS Requested | 12/31/2030 |
| Hondo Arroyo Storage | BESS | 101 | Tap 138 kV 5225 Hondo - 5813 Pearson | FIS Requested | 07/01/2028 |
| Adam Bryant BESS | BESS | 100 | Tap 138kV 5225 HONDO – 5819 HONDO CREEK | FIS Requested | 12/01/2027 |
| Hondo Arroyo Solar | Solar | 60 | Tap 138 kV 5225 Hondo - 5813 Pearson | FIS Requested | 07/01/2028 |
| Spinel Solar | Solar | 30 | Not listed | Withdrawn | n/a |
For residents and landowners
- What power projects are planned in Medina County?
- ERCOT's October 2026 report lists 7 active projects in Medina County totalling 956 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.