Counties / Texas
Jim Hogg County power projects
Jim Hogg County, Texas has 9 active power projects totalling 2,933 MW in ERCOT's interconnection queue as of the October 2026 report. Wind is the largest share at 1,746 MW (60%). The largest single project is Las Mujeres Solar (684 MW solar). 2 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
9
2.9 GW capacity
IA signed or later
2
22% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Jim Hogg County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Las Mujeres Solar | Solar | 684 | Cruces 7A (Bus #80079) | FIS Requested | 12/01/2029 |
| Mirando Valley Wind | Wind | 479 | Tap 345kV 80220 Cenizo - 80079 Cruce Ckt-1 | IA Signed | 07/06/2028 |
| Viento Bravo Wind | Wind | 366 | Tap 345kV 80220 Cenizo - 80079 Cruce Ckt-1 | IA Signed | 07/06/2028 |
| Ciervo Wind | Wind | 302 | Tap 345 kV 80355 DelSol7A - 80079 Cruce CKT 2 | FIS Requested | 12/31/2028 |
| Barranca Wind 1 | Wind | 301 | Tap the 345 kV CENIZO (#80225) - DELSOL (#80307) line | FIS Requested | 06/01/2028 |
| Barranca Wind 2 | Wind | 299 | Tap the 345 kV CENIZO7C (#80225) - DELSOL7C (#80307) line. | FIS Requested | 06/01/2028 |
| Bell Song Solar | Solar | 168 | Tap 345 kV #80079 CRUCE7A - #80355 DELSOL7A ckt 1 | FIS Requested | 09/15/2029 |
| Bell Song Solar 2 | Solar | 168 | Tap 345kV (#80079) CRUCE7A - (#80355) DELSOL7A ckt 1 | FIS Requested | 03/16/2030 |
| Bell Song Solar 3 | Solar | 168 | Tap 345 kV #80079 CRUCE7A - #80355 DELSOL7A ckt 1 | FIS Requested | 08/31/2030 |
For residents and landowners
- What power projects are planned in Jim Hogg County?
- ERCOT's October 2026 report lists 9 active projects in Jim Hogg County totalling 2,933 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.