Counties / Texas
Franklin County power projects
Franklin County, Texas has 7 active power projects totalling 2,374 MW in ERCOT's interconnection queue as of the October 2026 report. Natural gas is the largest share at 1,660 MW (70%). The largest single project is Prairie Ridge (Gas - CC) (1,660 MW natural gas). 3 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
7
2.4 GW capacity
IA signed or later
3
43% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
2
since Sep 2026
Changes in Franklin County
Stage change
09/17/2026
FIS Approved
Stage change
09/17/2026
FIS Approved
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Prairie Ridge (Gas - CC) | Gas | 1,660 | Tap 345 kV 11699 Woodard – 1695 Monticello | FIS Requested | 06/01/2032 |
| Lupinus Solar 2 | Solar | 242 | Hagansport Switch (old Monticello Tap bus# 1794) | IA Signed | 04/03/2027 |
| Lupinus Solar 1 | Solar | 162 | Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES | IA Signed | 09/13/2027 |
| Lupinus Storage 2 | BESS | 124 | Hagansport Switch (old Monticello Tap bus# 1794) | IA Signed | 04/03/2027 |
| Lazy Frog Solar SLF | Solar | 100 | 11688 Thorn Tree Switch 345kV | FIS Approved | 04/17/2028 |
| Lupinus Storage 1 | BESS | 84 | Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES | FIS Approved | 09/13/2027 |
| Lazy Frog Storage SLF | BESS | 0 | 11688 Thorn Tree Switch 345kV | FIS Approved | 04/17/2028 |
For residents and landowners
- What power projects are planned in Franklin County?
- ERCOT's October 2026 report lists 7 active projects in Franklin County totalling 2,374 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.