Clay County power projects

Clay County, Texas has 4 active power projects totalling 1,867 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 1,055 MW (57%). The largest single project is Hiru Solar (604 MW solar). 1 project has signed an interconnection agreement or reached a later stage. 1 project in the county is listed as withdrawn or cancelled.

Active projects
4
1.9 GW capacity
IA signed or later
1
25% of active projects
Withdrawn or cancelled
1
listed by ERCOT
Changes tracked
2
since Sep 2026

Changes in Clay County

MW change
10/01/2026
Clay County Yang Storage · BESS · Clay County
Requested capacity increased.
307 → 308 MW
Withdrawn
09/14/2026
Lutum Wind · Wind · Clay County
Listed as cancelled by ERCOT.
−242 MW

All projects

For residents and landowners

What power projects are planned in Clay County?
ERCOT's October 2026 report lists 4 active projects in Clay County totalling 1,867 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.