LoneStarGrid
ERCOT GIS report of 10/01/2026 2 monthly reports compared Next update after ERCOT's next monthly report
Counties / Texas

Williamson County power projects

Williamson County, Texas has 1 active power project totalling 449 MW in ERCOT's interconnection queue as of the October 2026 report. Natural gas is the largest share at 449 MW (100%). The largest single project is Big Watt Mustang Power (449 MW natural gas). 0 projects have signed an interconnection agreement or reached a later stage. 2 projects in the county are listed as withdrawn or cancelled.

Active projects
1
0.4 GW capacity
IA signed or later
0
0% of active projects
Withdrawn or cancelled
2
listed by ERCOT
Changes tracked
1
since Sep 2026

Changes in Williamson County

COD change
10/01/2026
Big Watt Mustang Power · Gas · Williamson County
Projected COD moved 09/01/2027 → 12/15/2028. Delay #1 for this project.
+15 mo

All projects

ProjectFuelMWSubstationStageCOD
Big Watt Mustang PowerGas449Tapping the 138 kV line from Taylor (Bus#3658) to Thorndale North (Bus#3659)FIS Requested12/15/2028
Cornwall SolarSolar204Not listedWithdrawnn/a
Cornwall BESSBESS204Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Williamson County?
ERCOT's October 2026 report lists 1 active project in Williamson County totalling 449 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.