Commodus 2 Wind

Commodus 2 Wind is a 642 MW wind project in Swisher County, Texas, connecting at Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900). ERCOT's October 2026 report shows it at the FIS Requested stage with a projected commercial operation date of 07/30/2029.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
29INR0033
Capacity
642 MW
Fuel
Wind (WT)
Interconnecting entity
IP Blackwell II, LLC
Projected COD
07/30/2029
Entered queue
02/18/2025
ERCOT zone
PANHANDLE
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 02/18/2025
    Entered the queue with 642 MW, projected COD 07/30/2029
  • 02/18/2025
    Screening → FIS Requested

Other projects at this substation

Commodus 2 SolarSolar502 MWFIS Requested