GAMAY ENERGY STORAGE is a 419 MW battery storage project in Brazoria County, Texas, connecting at Tap 138 kV Line from TNFM524 (39703) to West Columbia Main (39500), in Brazoria County.. ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 01/01/2028.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
26INR0417
Capacity
419 MW
Fuel
BESS (BA)
Interconnecting entity
GAMAY ENERGY STORAGE LLC
Projected COD
01/01/2028
Entered queue
01/26/2024
ERCOT zone
COASTAL
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 05/27/2025
    FIS Requested → IA Signed
  • 01/26/2024
    Entered the queue with 419 MW, projected COD 01/01/2028
  • 01/26/2024
    Screening → FIS Requested