25INR0741 · Solar · Wharton County

Hollywood Solar Repower

COD date passed

Hollywood Solar Repower is a 9.9 MW solar project in Wharton County, Texas, connecting at 44060 BLU 345kV. ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 09/30/2026. Its projected COD of 09/30/2026 has already passed without ERCOT approval to synchronize, so the date is likely to move.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
25INR0741
Capacity
9.9 MW
Fuel
Solar (PV)
Substation
44060 BLU 345kV
Interconnecting entity
RED TAILED HAWK SOLAR LLC
Projected COD
09/30/2026
Entered queue
10/21/2025
ERCOT zone
SOUTH
Size category
Small

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 10/21/2025
    Entered the queue with 9.9 MW, projected COD 09/30/2026
  • 10/21/2025
    Screening → IA Signed