25INR0741 · Solar · Wharton County
Hollywood Solar Repower
COD date passed
Hollywood Solar Repower is a 9.9 MW solar project in Wharton County, Texas, connecting at 44060 BLU 345kV. ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 09/30/2026. Its projected COD of 09/30/2026 has already passed without ERCOT approval to synchronize, so the date is likely to move.
ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved
Key facts
- INR
- 25INR0741
- Capacity
- 9.9 MW
- Fuel
- Solar (PV)
- Substation
- 44060 BLU 345kV
- County
- Wharton County
- Interconnecting entity
- RED TAILED HAWK SOLAR LLC
- Projected COD
- 09/30/2026
- Entered queue
- 10/21/2025
- ERCOT zone
- SOUTH
- Size category
- Small
Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page
History
- 10/21/2025Entered the queue with 9.9 MW, projected COD 09/30/2026