24INR0712 · BESS · Brazoria County
Byrd Ranch Repower
Byrd Ranch Repower is a 5.5 MW battery storage project in Brazoria County, Texas, connecting at 39700 SWEENY 138kV. ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 01/22/2027.
ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved
Key facts
- INR
- 24INR0712
- Capacity
- 5.5 MW
- Fuel
- BESS (BA)
- Substation
- 39700 SWEENY 138kV
- County
- Brazoria County
- Interconnecting entity
- Byrd Ranch Storage LLC
- Projected COD
- 01/22/2027
- Entered queue
- 12/14/2020
- ERCOT zone
- COASTAL
- Size category
- Small
Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page
History
- 12/14/2020Entered the queue with 5.5 MW, projected COD 01/22/2027
- 12/14/2020Screening → IA Signed