Zavala County power projects
Zavala County, Texas has 6 active power projects totalling 692 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 571 MW (82%). The largest single project is Bramble Energy Center (225 MW battery storage). 1 project has signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
6
0.7 GW capacity
IA signed or later
1
17% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Zavala County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Bramble Energy Center | BESS | 225 | 8236 West Batesville 138kV | FIS Requested | 12/22/2028 |
| SunShiner ESS | BESS | 200 | 8008 La Pryor4A | FIS Requested | 05/11/2029 |
| Flying Kite Bess | BESS | 105 | Tap the 138 kV La Pryor (#8008) - Poblano (#8009) | FIS Requested | 12/30/2027 |
| Flying Kite Solar | Solar | 80 | Tap the 138 kV La Pryor (#8008) - Poblano (#8009) | IA Signed | 12/30/2027 |
| La Mancha Solar SLF | Solar | 41 | Tap 69kV 5836 NBatesville - 5822 Leona | FIS Requested | 10/10/2028 |
| La Mancha Storage SLF | BESS | 41 | Tap 69kV 5836 NBatesville - 5822 Leona | FIS Requested | 10/10/2028 |
For residents and landowners
- What power projects are planned in Zavala County?
- ERCOT's October 2026 report lists 6 active projects in Zavala County totalling 692 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.