Counties / Texas
Somervell County power projects
Somervell County, Texas has 2 active power projects totalling 666 MW in ERCOT's interconnection queue as of the October 2026 report. Natural gas is the largest share at 495 MW (74%). The largest single project is Black Mountain Somervell Gas Combined (495 MW natural gas). 1 project has signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
2
0.7 GW capacity
IA signed or later
1
50% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
1
since Sep 2026
Changes in Somervell County
Stage change
09/17/2026
FIS Approved
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Black Mountain Somervell Gas Combined | Gas | 495 | Dinosaur Switch (#15208) | FIS Requested | 09/28/2029 |
| Yellow Viking Solar | Solar | 171 | Tap 345kV 1900 Comanche Peak - 11886 Timberview Switch | IA Signed | 07/13/2027 |
For residents and landowners
- What power projects are planned in Somervell County?
- ERCOT's October 2026 report lists 2 active projects in Somervell County totalling 666 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.