Counties / Texas
Hunt County power projects
Hunt County, Texas has 10 active power projects totalling 1,476 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 990 MW (67%). The largest single project is 18-BRAVO BESS (407 MW battery storage). 3 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
10
1.5 GW capacity
IA signed or later
3
30% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
1
since Sep 2026
Changes in Hunt County
Stage change
09/03/2026
IA Signed
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| 18-BRAVO BESS | BESS | 407 | 138 kV Commerce Switch Substation. Bus no. #1816 | FIS Requested | 02/01/2028 |
| Fermata BESS | BESS | 204 | Tap 345kV 2464# CASHSW_T5 – 2461# ROYSE_N5 | FIS Requested | 07/01/2028 |
| Ceres BESS | BESS | 203 | Tap 138 kV 6883 QUINLAN NORTH SS - 6860 UNION VALLEY SS | FIS Requested | 08/10/2028 |
| McMurtre Storage | BESS | 176 | tap 138kV 1819 Commerce South - 1815 Cumby Tap | IA Signed | 12/31/2027 |
| Pink Solar SLF | Solar | 152 | 971 Pruitt 138kV | IA Signed | 07/31/2029 |
| Power Lane II - Gas | Gas | 104 | GREENV_IN_8 (977) via (future) GEUS_STM Substation | FIS Requested | 08/15/2027 |
| Power Lane II Gas - Alternate | Gas | 104 | Tap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation | FIS Requested | 06/01/2027 |
| VALDIVIAN SOLAR | Solar | 75 | 138kV 1816 Commerce Switch - 1809 Wolf City | IA Signed | 09/22/2028 |
| MAKALU SOLAR | Solar | 50 | Tap 138kV 977 Pruitt - 971 Greenville | FIS Requested | 07/24/2028 |
| Pink Storage SLF | BESS | 0 | 971 Pruitt 138kV | FIS Requested | 07/31/2029 |
For residents and landowners
- What power projects are planned in Hunt County?
- ERCOT's October 2026 report lists 10 active projects in Hunt County totalling 1,476 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.