Counties / Texas
Hardeman County power projects
Hardeman County, Texas has 8 active power projects totalling 2,194 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 1,381 MW (63%). The largest single project is Tabor Solar (506 MW solar). 0 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
8
2.2 GW capacity
IA signed or later
0
0% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Hardeman County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Tabor Solar | Solar | 506 | Tap 345kV 60504 Tesla - 61001 Jim Treece | FIS Requested | 04/16/2027 |
| Earthwise Solar | Solar | 370 | Tap 345kV 60504 Tesla - 61001 Jim Treece | FIS Requested | 12/31/2028 |
| Lazy U Solar 1 | Solar | 252 | Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A ckt2 | FIS Requested | 06/30/2029 |
| Lazy U Solar 2 | Solar | 252 | Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A ckt2 | FIS Requested | 06/30/2029 |
| Juniper Ridge BESS 1 | BESS | 252 | Tap EDITHCLA7B [60505] -- TESLA7A [60501] 345kV ckt2 | FIS Requested | 06/30/2029 |
| Juniper Ridge BESS 2 | BESS | 252 | Tap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2 | FIS Requested | 06/30/2029 |
| Supra Wind | Wind | 206 | Tap #6101 Riley 7A to #60505 Edithcla 7B 345kV | FIS Requested | 12/23/2027 |
| Hardeman BESS | BESS | 104 | 6050 PAUL 138kV | FIS Requested | 06/30/2028 |
For residents and landowners
- What power projects are planned in Hardeman County?
- ERCOT's October 2026 report lists 8 active projects in Hardeman County totalling 2,194 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.