Counties / Texas
Bandera County power projects
Bandera County, Texas has 3 active power projects totalling 336 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 211 MW (63%). The largest single project is Motif BESS II (201 MW battery storage). 2 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
3
0.3 GW capacity
IA signed or later
2
67% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Bandera County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Motif BESS II | BESS | 201 | 7440 Tarpley 138kV | FIS Requested | 02/19/2029 |
| Shaw Solar | Solar | 125 | Tap 138kV 7146 Verde Creek - 7438 Bandera | Sync Approved | 10/16/2026 |
| Medina City BESS | BESS | 10 | Station Name (TDSP Station Code): MEDINA; Load/Load Transformer Name: L_MEDICI9_1Y; PTI BUS number: 7430; Voltage in kV (Transmission Level): 69kV | Sync Approved | 11/26/2026 |
For residents and landowners
- What power projects are planned in Bandera County?
- ERCOT's October 2026 report lists 3 active projects in Bandera County totalling 336 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.