Substation / point of interconnection ยท Ward County
tap 345kV Riverton Switch - Sand Lake Switch
1 active project totalling 1,350 MW is queued to connect at tap 345kV Riverton Switch - Sand Lake Switch in Ward County, Texas, according to ERCOT's October 2026 report.
Active capacity
1,350 MW
queued at this substation
Active projects
1
1 project ever listed
Withdrawn share EST
0%
of projects listed here
Voltage
345 kV
read from the name
Projects at this substation
| INR | Project | Fuel | MW | Stage | COD | Delays |
|---|---|---|---|---|---|---|
| 25INR0008 | BasRanch (TEF - Due Diligence) | Gas | 1,350 | IA Signed | 12/01/2028 | 0 |