29INR0167 · Gas · Caldwell County
Big Watt Power Austin-1
COD delayed 1×
Big Watt Power Austin-1 is a 449 MW natural gas project in Caldwell County, Texas, connecting at Tapping the 345 kV Double circuit Line: Zorn (Bus# 7042) - Lytton Springs (Bus# 9074) and Zorn (Bus# 7042) - Austrop (Bus# 7040).. ERCOT's October 2026 report shows it at the FIS Requested stage with a projected commercial operation date of 11/15/2028. Its projected COD has been pushed back 1 time in the reports compared.
ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved
Key facts
- INR
- 29INR0167
- Capacity
- 449 MW
- Fuel
- Gas (CC)
- County
- Caldwell County
- Interconnecting entity
- Big Watt Power Austin-1 LLC
- Projected COD
- 11/15/2028
- Entered queue
- 09/26/2025
- ERCOT zone
- SOUTH
- Size category
- Large
Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page
History
- 10/01/2026Projected COD moved 11/01/2028 → 11/15/2028 (0 months)
- 09/26/2025Entered the queue with 449 MW, projected COD 11/01/2028
- 09/26/2025Screening → FIS Requested