Ouroboros Grid BESS 4

Ouroboros Grid BESS 4 is a 201 MW battery storage project in Cameron County, Texas, connecting at 79500 Palmito 345kV. ERCOT's October 2026 report shows it at the Screening stage with a projected commercial operation date of 06/01/2029.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
28INR0427
Capacity
201 MW
Fuel
BESS (BA)
Interconnecting entity
Ouroboros Grid BESS Unit 4
Projected COD
06/01/2029
Entered queue
08/18/2025
ERCOT zone
COASTAL
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 08/18/2025
    Entered the queue with 201 MW, projected COD 06/01/2029