26INR0254 · BESS · Van Zandt County

Goldfinch Storage

Goldfinch Storage is a 100 MW battery storage project in Van Zandt County, Texas, connecting at Tap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch. ERCOT's October 2026 report shows it at the FIS Requested stage with a projected commercial operation date of 03/31/2030.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
26INR0254
Capacity
100 MW
Fuel
BESS (BA)
Interconnecting entity
BT DJ4M Solar, LLC
Projected COD
03/31/2030
Entered queue
09/20/2023
ERCOT zone
NORTH
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 09/20/2023
    Entered the queue with 100 MW, projected COD 03/31/2030
  • 09/20/2023
    Screening → FIS Requested

Other projects at this substation