24INR0271 · BESS · Freestone County

Bar Candela Storage SLF

COD delayed 1×

Bar Candela Storage SLF is a 0 MW battery storage project in Freestone County, Texas, connecting at Long Lake Sub (Bus 3280) – Long Lake Tap Switch (Bus 3279). ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 05/16/2029. Its projected COD has been pushed back 1 time in the reports compared.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
24INR0271
Capacity
0 MW
Fuel
BESS (BA)
Interconnecting entity
Bar Candela Storage Project LLC
Projected COD
05/16/2029
Entered queue
03/21/2022
ERCOT zone
NORTH
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 10/01/2026
    Projected COD moved 12/31/2027 → 05/16/2029 (+17 months)
  • 05/06/2025
    FIS Requested → IA Signed
  • 12/05/2022
    Screening → FIS Requested
  • 03/21/2022
    Entered the queue with 0 MW, projected COD 12/31/2027

Other projects at this substation

Bar Candela Solar SLFSolar200 MWIA Signed