Cumulus Grid BESS

Cumulus Grid BESS is a 211 MW battery storage project in Ellis County, Texas, connecting at 1906 Venus Switch Substation 345kV. ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 01/01/2028.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
24INR0178
Capacity
211 MW
Fuel
BESS (BA)
Interconnecting entity
Cumulus Grid, LLC
Projected COD
01/01/2028
Entered queue
03/14/2022
ERCOT zone
NORTH
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 06/03/2025
    FIS Approved → IA Signed
  • 01/27/2025
    FIS Requested → FIS Approved
  • 10/18/2022
    Screening → FIS Requested
  • 03/14/2022
    Entered the queue with 211 MW, projected COD 01/01/2028

Other projects at this substation