Martin County power projects
Martin County, Texas has 3 active power projects totalling 492 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 492 MW (100%). The largest single project is Jane Storage Energy Center (241 MW battery storage). 1 project has signed an interconnection agreement or reached a later stage. 1 project in the county is listed as withdrawn or cancelled.
Active projects
3
0.5 GW capacity
IA signed or later
1
33% of active projects
Withdrawn or cancelled
1
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Martin County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Jane Storage Energy Center | BESS | 241 | 59901 Grelton 345 kV | FIS Requested | 11/01/2030 |
| Stewart Grady BESS | BESS | 150 | Tap 138kV 11368 Expanse Switch – 23841 Sale Ranch | FIS Requested | 04/17/2029 |
| Picadillo BESS | BESS | 101 | 23837 Buffalo 138kV | IA Signed | 05/15/2028 |
| Millennium Energy Storage | BESS | 103 | Not listed | Withdrawn | n/a |
For residents and landowners
- What power projects are planned in Martin County?
- ERCOT's October 2026 report lists 3 active projects in Martin County totalling 492 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.